The drainage study focused on the proposed improvements of National Avenue along with the improvements of the adjacent commercial property and the effect these improvements would have on upstream and downstream drainage patterns. The improvements within the sub-basin drove a need to define a drainage conveyance system. The study included field survey, reviewing past drainage studies for the area, reviewing proposed site plans within the basin, and a detailed analysis.